Tuesday, July 26, 2011

ITO - Ergon Energy (QLD) - Supply and Integration of a 3G/4G Cellular Data Wireless System

The scope of this Contract is to do everything required to design, supply, install, test and commission a 3G / 4G cellular data wireless system as follows:

Separable Portion 1 – provide the core network infrastructure in Townsville and a base station at Mt Stuart.

Separable Portion 2 – following completion of Separable Portion 1 and at Ergon Energy’s sole discretion, provide a redundant core installation in Rockhampton.

Separable Portion 3 – following completion of Separable Portion 1 and at Ergon Energy’s sole discretion, provide up to 160 additional base stations.

Separable Portion 4 – the supply of additional services and parts. 



Closing Date: 31/08/11


Link to Notification